Skip to main content
Available for new work~13,000 GitHub contributions · 100+ repos

Hey, I'm 👋

Griffin Long

Agentic AI Engineer · Technical Founder

A self-taught AI engineer who went from line cook to shipping production agent systems.

I don't out-type teams — I build and direct the AI agent tooling that lets one person ship at team scale.

scroll↓
#01

My story

How a line cook ended up building AI agent systems.

I didn't take the traditional route into software. I taught myself to build with AI while working as a line cook and taking college classes — experimenting with ChatGPT on the side until it turned into something real.

In March 2025 I turned that into GRAIsol. In the ~15 months since, it's grown into roughly 13,000 GitHub contributions across 100+ repos: an open-source agent runtime (agent-afk), a 369K-LOC AI GTM-automation platform, and 12 published open-source packages.

The throughline: I don't out-type teams — I build and direct the AI agent tooling that lets one person ship at team scale. Same energy I brought to the kitchen — high tempo, reliable under pressure — now pointed at shipping software end to end.

Dual monitors glowing in a dim room — the workspace where the agent tooling gets built
where the work happens
A desk lit by a monitor at night — notes and papers scattered across it, mid-build
deep in it
#02

Things I’ve built

Open-source tools, production platforms, and the agent infrastructure behind them.

open-source TypeScript agentic coding-agent runtime/harness

LOC

~308K TS/TSX

npm versions

408

commits

1,542

license

Apache-2.0

SWE-bench
72.2% Sonnet / 77.8% Kimi+Qwen

36-instance non-networked subset, own-harness eval, web tools disabled

TypeScriptNode.jsMCPAgentic AI

AgentGRAI

Modular Next.js / React AI lead-intelligence and outbound platform with multi-stage enrichment, async queue architecture, Gmail outbound engine, and AI SDR layer

LOC

~369K

commits

~1,900

timeframe

~5 months

Next.jsReactTypeScriptPostgreSQLRedis

Full Python CLI wrapping Substack's unofficial API with write-safety gates and destructive-op guards

LOC ~7,142
tests 234
commands 50+
PythonSubstack APICLI

Native macOS terminal in Swift 6 / AppKit — no Electron, no Xcode project — with a file-tree sidebar, 22-language syntax-highlighted editor, git status badges, split panes, shell integration, and 10 color themes gated by 345 contrast assertions

source files 91
editor languages 22
color themes 10
Swift 6AppKitSwiftTermMetal

7 MCP Servers

ElevenLabs Voice MCP

tools: 23

ClickUp MCP

tools: 19

Cursor Agent MCP

merged PRs: 40

E2B MCP

Twilio MCP

Smartlead MCP

GPT Image MCP

x-api-cli

Full TypeScript CLI for the X/Twitter API v2 with OAuth 1.0a, OAuth 2.0, and Bearer auth

TypeScriptX APICLI

ga-cli

Python CLI for the Google Analytics 4 API covering properties, reports, acquisition, referrers, and trends

PythonGoogle AnalyticsCLI

agent-framework

Claude Code / agent-afk plugin for autonomous task execution through composable skills, subagents, and hooks

PythonClaude Codeagent-afk

gadscli

Async Rust CLI for the Google Ads API, published to npm (npm-only)

RustGoogle Adsnpm

A/B Experimentation Platform

5-service Docker Compose system with chi-squared significance from scratch, SHA-256 user bucketing, and database-level race-condition handling

FastifyNext.jsPostgreSQL

On-Device AI Tools

Local macOS menu-bar dictation (mlx-whisper) and system-wide inline ghost-text completion (MLX Swift) for Apple Silicon

SwiftMLXApple Silicon
#03

Tools I build with

The stack behind the projects above.

Languages

TypeScriptJavaScriptPythonRustSwiftSQL

Frameworks & Runtimes

Node.jsNext.jsReactAstroFastifyTailwind CSS

AI & Agents

agent-afkClaude Agent SDKOpenAI APIModel Context Protocol (MCP)Agentic orchestrationMulti-agent systemsPrompt engineeringLLM evalsPlaywright automationLocal models (MLX, llama.cpp, Ollama, LM Studio)

Data & Infrastructure

PostgreSQLSupabaseFirebaseRedisUpstash QStashDockerVercelRailwayStripeTwilioElevenLabsGoogle APIsSentryPostHogSelf-hosted CI/CD
#04

Experience

From founding GRAIsol to embedded contract work and independent consulting.

Special Projects Engineer (Contract)

Capital Mischief / R360 / Charlie Garcia · Remote (Daytona Beach)

Jul 2026 – PresentCurrent
  • Built a daily editorial intelligence pipeline (~7,960 LOC Python, 3 packages) for a 22K-subscriber finance Substack (~$1.76M ARR): prep, editorial judgment, brief generation, essay drafting, publish verdicts, and post-hoc scorecards.
  • Designed deterministic anti-fabrication guards that drop any AI-drafted content whose facts, numbers, or named entities are not verbatim in the author's published words; human-in-the-loop approval required before anything ships.
  • Built and run 7 automated cron/daemon tasks delivering daily research briefs, analytics pulses, desk dashboards, and Monday team briefings to 3 Telegram channels.
  • Built a 4-panel HTML desk dashboard (fleet health, workflows, review queue, signal desk) with daily email delivery; packaged all systems as an agent-afk plugin with 100 test functions.

Founder and AI Systems Engineer

GRAIsol (opens in new tab) · Daytona Beach, FL

Mar 2025 – PresentCurrent
  • Built and open-sourced agent-afk (agentafk.com), a TypeScript agentic coding-agent runtime/harness: ~308K LOC, 1,542 commits, 408 published npm versions, Apache-2.0.
  • Architected AgentGRAI, a modular Next.js / React AI lead-intelligence and outbound platform (~369K LOC, ~1,900 commits in ~5 months): multi-stage enrichment on async QStash queues with Redis-semaphore concurrency control.
  • Extended it with a Gmail outbound engine (multi-inbox rotation, AI sequences, open/click tracking, AI reply classification) and an AI SDR layer with ICP scoring and human-handoff routing.
  • Published 12 open-source packages across npm and GitHub: 7 MCP servers (ElevenLabs Voice – 23 tools, ClickUp – 19 tools, Cursor Agent – 40 merged PRs / SSE on Vercel, E2B, Twilio, Smartlead, GPT Image), plus agent-afk, gadscli, substack-cli, x-api-cli, and ga-cli.
  • Ran a one-person AI-leveraged studio delivering 30+ client and product builds.
  • Accumulated ~13,000 GitHub contributions across 100+ repos since Mar 2025.

AI Systems Engineer (Contract)

Atlas Digital · Remote

Oct 2025 – Mar 2026
  • Embedded directly with client leadership to design and deploy an end-to-end CRM and agent automation pipeline: lead intake, enrichment, scoring, qualification, and outbound handoff in production.
  • Built customer-facing agent workflows on Claude Agent SDK and OpenAI with structured fallback/retry logic and production observability; owned architecture end-to-end from design through deployment.

Independent AI Consultant

Remote · Remote

2026Current
  • Fuly Kids (fulykids.com): Diagnosed recurring LLM over-spend in FulyScan (AI food-scanning nutrition tool); shipped fix via merged PR adding Supabase/Postgres caching so repeat scans reuse stored results instead of re-invoking Claude.
  • adside.ai: Delivered prioritized UX and product audit covering onboarding friction, cognitive overload, missing agency-facing tooling, data-freshness gaps, agent latency, and strategic positioning.
#05

Right now

Last updated Sep 2026.

The Goblin Files

Beachy code goblin building shit in Daytona. Subscribe on Substack.